Tuesday, March 19, 2013

Leg work

Fixed up my legs and put the extra 1/2 slices inside with the bigger 1/2 leg piece. All I need to do is make an opening for the wires, drill a jole for the bolt, glue, attach the bolt, and paint the legs white.

Also need to get a 1 inch electrical pipe, thread it or have it threaded, get a 3/4 inch flange, and assemble.....for now

Saturday, March 2, 2013

Side Project: Ceramic R2 dome


I got bored in ceramics and made an R2 dome (clear glaze and iron oxide). Maybe I'll make a full R2 if I have time. Lately I've been bored out of my mind since my week to throw on the potters wheel hasn't come and I finished all my other projects.
Maybe it's just me but I think the radar eye is on the wrong side or the radar eye is on the wrong side....